LARGE FACTORY FIRE AT NATIONAL PROCESSING COMPANY ON W 127TH ST, CHICAGO

    FRI MAR 07 2014 ~4:24 AM
    CHICAGO FIRE DEPARTMENT
    FACTORY FIRE/STILL AND BOX/WORKING FIRE
    429 W 127TH ST CHICAGO, IL

    E75 CREW ON ARRIVAL REPORTS FIRE THROUGH THE ROOF. LARGE FACTORY FIRE TWO CITY BLOCKS BY THREE CITY BLOCKS. OIL FIRE STARTED IN A "REFINERY." THE BUSINESS IS A METAL MATERIALS PROCESSING BUILDING. LARGE AMOUNT OF OIL WAS BURNING. WATER PROBLEMS -- FOUND SOURCE OF WATER INSIDE THE BUILDING. FIRE SELF-VENTED THROUGH THE ROOF -- POSSIBLY EXPLOSION WHEN THE FIRE STARTED.

    OIL VAT WAS ON FIRE, WHICH IS KNOCKED AT ABOUT 4:54 AM. THE HAZARDS IN THE BUILDING ARE "NOWHERE NEAR" THE LOCATION OF THE FIRE, ACCORDING TO 2-2-6.



    ENGINE(S): E75 E115

    TRUCK(S): T27 T62

    SQD CV2-7-4

    RIT: BC21 T24

    CHIEF(S): BC22

    EMS: AMB FC STANDBY AMB

    STILL AND BOX ALARM AT 04:28 AM

    CHIEF(S):
    BC24  BOX CHIEF
    BC18 PLANS
    2-2-6


    SPECIAL:  6-2-5 (DRY CHEMICAL UNIT)

    LEVEL 1 HAZMAT AT 4:37 AM

    WIND: SSE 5 MPH

    STAGING: 127TH ST AND STATE  CHANGED TO 127TH ST AND MICHIGAN BECAUSE OF WIND.

    STILL AND BOX ALARM STRUCK OUT AT 5:01 AM ON ORDERS OF 2-2-6.

    OFI 4-6-6

    LIVE TRAFFIC MAP …
    http://maps.google.com/?q=429+w+127th+st+chicago,+il&t=h&z=17&layer=t

    Get updates in your Facebook feed
    http://www.facebook.com/CardinalEmergencies

Blog Archive